O&K 40hp in 009: details complete...

The O&K is now detailed and ready for painting. Since my last post I've added the finishing touches...
First of all the clack valves we're added either side of the boiler from 0.7mm wire (for the pipe) plastic section (for the valve) and an etched brass hand wheel from my bits box. 
The motion is also now 'supported' with a piece of L shaped plasticard. The sand box has an actuator (0.4mm brass wire) and the couplings (RT models cut down) we're fitted, using my RT models coupler height gauge. 
Next up is a coat of satin black and then lining! More soon...

Comments